David Lloyd, Colchester
- Duration
- 12 Weeks
- Framework
- 2000 Metres
We were instructed to supply Layher scaffolding across the site, including a large ramp to gain access to a high level roof. It was imperative the roof had a safe and stable route for contractors to gain access to the roof and for materials to be moved. We created a ramp from Layher to achieve all the needs for this job to be carried out safely.
“We have worked with DTE before and will continue to work with them as they always provide the highest level of professionalism and will always find a solution to any obstacle.”