Scaffolding

Imperial War Museum, Duxford.

Duration
2 Weeks
Framework
DTE was awarded the contract works at The Imperial War Museum, Duxford.
 
We have been working alongside the main contractors to assist with ongoing works at the museum. The duration of the Layher construction was meant to be done in four weeks but this was achievable and erected in two weeks. This also included the 102 tons of counterweights.